Wool Works

The Wool Works job consisted of the construction of a new customer owned substation.  This was the first major decarbonization project in South Canterbury.

 

  • This work was undertaken by our Technical team
  • We assisted the customer to upgrade their boiler from thermal fuelled to electric powered
  • Install RPS switchgear and 11kV cabling to new electric boiler